CHURCH/SCHOOL ROOF ($1M)
The roof for the church and school is leaking in many places. The leaking has caused water damage and puts the church's assets at risk. The top priority of the campaign is to do a full replacement of the roof to a low slope roof, which is engineered to channel water away from the roof to the drains and downspouts.
PARKING LOT ($250K)
The parking lot is in poor shape and in some areas is unsafe for people and vehicles. Some areas will need to receive a new base layer. Other areas will only need to be replaced with a blacktop surface.
CARPORT/BELL TOWER ($250K)
The current parish bell tower structure has served its purpose and needs to be replaced due to structural deterioration. The goal is to rebuild the bell tower and create a carport over the main church entrance, thus improving the overal facade. The hope is to create an entrance which proclaims to the world, and reminds us, that this is where God dwells and we come to encounter and worship Him.
Capital Campaign
St. Jerome Catholic Church
1550 Farnham St.
Columbus, WI 53925